The NBIMS-US™ v4 is a consensus-based national-level standard focused on defining standard approaches and guidelines to defining requirements, planning BIM adoption, and exchanging information between project team members. MORE
5.2.3.1 Requirement for Participation
The OPR shall require the use of a CDE for the project.
5.2.3.2 Restrictions / Limitations
The OPR shall indicate any restrictions or limitations to the CDE.
5.2.3.3 Capabilities
The OPR shall indicate what functions a CDE shall be capable of performing. In the case that the owner is not capable of defining the capabilities, the delivery team shall be responsible for defining the capabilities of the CDE in the BEP.
5.2.3.4 Document Metadata
The OPR shall indicate specific metadata that shall be attached to documents stored within the CDE. In the case that the owner is not capable of defining the metadata, the delivery team shall be responsible for defining the metadata of the CDE in the BEP.
5.2.3.5 CDE Framework Documentation
The OPR shall require the CDE framework to be documented in the BEP if not provided by the owner. The OPR shall also indicate which party is responsible for the management of the CDE during the project.
The NBIMS-US™ v4 is a consensus-based national-level standard focused on defining standard approaches and guidelines to defining requirements, planning BIM adoption, and exchanging information between project team members. MORE
Established by the United States Congress, NIBS’ mission is to serve the public interest by advancing building science and technology to improve the built environment.
Subscribe to receive NIBS news and information.
Follow us: